Skip to content
ARC Clean Technology
Advanced small modular reactor

Powering the AI revolution and the industrial infrastructure of tomorrow

The ARC-100 delivers 100MWe of firm, clean baseload power. Built for campuses and grids that cannot tolerate interruption. 30 years of prototype operating experience. Simple, low pressure, modular design.

100 MWe
Per unit output
20yr
Fuel cycle
95%
Capacity factor

AI never sleeps. Neither does its power source. The ARC-100 delivers 100 megawatts of firm, clean baseload. Built for customers who demand reliable power without compromise.

ARC Clean Technology · 2026
The ARC Advantage

Engineered for firm, dispatchable power

The ARC-100 is a sodium-cooled fast reactor using metallic fuel, leveraging proven technology and ongoing licensing engagement in the US and Canada.

30 Years of Real Data

The ARC-100 refines the underlying technology of the EBR-II which operated successfully at Idaho National Laboratory for over 30 years.

EBR-II, Argonne National Laboratory, 1964–1994

AI-Ready Infrastructure

24/7 high-density baseload with true load following. Compact enough to co-locate directly on a hyperscale campus. No grid dependency.

Accelerated Path to Power

Factory-fabricated modules ship to site for rapid assembly, enabling a streamlined transition from first concrete to power generation.

Passive Safety

Sodium coolant operates at atmospheric pressure. If every system fails, the reactor shuts itself down. No operator action. No external power.

Demonstrated: EBR-II loss-of-flow test, April 3, 1986

20-Year Fuel Cycle

One fuel load runs for two decades. No refueling outages. No exposure to uranium spot prices. Energy cost is locked at signing.

Multi-Unit Scalable

Deploy multiple units on a single site to match demand. 100MWe to 600MWe+. Each unit fits within a city block footprint.

Applications

Where the ARC-100 goes to work

View all applications →
100 MWe
Per unit · 24/7 baseload
Power Application

AI Data Centers

100MWe of guaranteed, 24/7 baseload power per unit. Co-locate directly with hyperscale campuses. No grid dependency. No intermittency. The ARC-100 delivers the energy density AI demands on a city-block footprint.

Learn more →
75K
Households per unit
Power Application

Electrical Grid

Dispatchable, carbon-free generation that ramps with demand. Each ARC-100 replaces a retiring coal or gas plant with 75,000 households worth of firm capacity. No weather dependency.

Learn more →
510°C
Sodium outlet temp
Industrial Heat

Heavy Industry

The ARC-100 generates 100MW of electrical energy and 286MW of thermal energy with an outlet temperature of 510°C providing direct superheated steam which can be increased to 850°C with topping heat for a wide range of industrial applications including chemicals, mining and petrochemical operations.

Learn more →
Mo-99 / Ac-225
Critical isotopes
Medical

Medical Isotopes

The fast-neutron spectrum of the ARC-100 generates high value isotopes at scale including Mo-99, Ac-225 and other critical isotopes as a byproduct of normal operation. This helps close a global supply gap.

Learn more →
2026 Milestones

Milestones on the public record

ARC has advanced the ARC-100 through CNSC Vendor Design Review Phase II and preliminary design.

Complete

CNSC Vendor Design Review, Phase II

Only liquid metal cooled SMR in Canada to complete this review. No fundamental barriers to licensing.

Complete

Preliminary Design Phase

Full preliminary design complete.

Complete

Series B Closed

Funding round closed. Investors include multiple VC funds and strategic partners.

Active

KHNP Global Partnership

Collaboration for global deployment of the ARC-100.

Active

Alberta Project with Nucleon

Second Canadian deployment targeting industrial energy demands in Alberta.

Active

US Expansion

Finalizing first US project. In discussions with data center developers for behind-the-meter power.

Ecosystem

Partners and collaborators advancing deployment readiness

GE Vernova Hitachi
GE Vernova Hitachi
Hatch
Hatch
KHNP
KHNP
NB Power
NB Power
IC Holding
IC Holding
IHI Corporation
IHI Corporation
Argonne National Laboratory
Argonne National Laboratory
Idaho National Laboratory
Idaho National Laboratory
Canadian Nuclear Laboratories
Canadian Nuclear Laboratories
Nucleon Energy
Nucleon Energy
DeepAtomic
Deep Atomic
University of New Brunswick
University of New Brunswick
Newsroom

Latest news

View all news
Apr 28, 2026Technology

ARC Clean Technology Commends DOE Effort to Expand Used Nuclear Fuel Recycling

ARC commends the U.S. Department of Energy (DOE) for its continued leadership in advancing used nuclear fuel recycling through new public-private partnerships.

Read More
Apr 14, 2026Regulatory

ARC Clean Technology reaffirms commitment to NRC Part 53 licensing framework following final rule issuance

ARC reaffirms its commitment to the NRC Part 53 licensing framework following the issuance of the final rule, advancing the path to US deployment of the ARC-100.

Read More
Apr 10, 2026Partnership

ARC-100 eyes Turkish deployment

NEI Magazine covers ARC Clean Technology's term sheet with IC Nuclear & Industry to explore deployment and development of the ARC-100 reactor in Türkiye.

Read More

Next step

Start a conversation about your energy project

Whether you are scoping a data center, replacing a retiring fossil plant, or evaluating industrial heat, our project development team can deliver a preliminary site assessment within 30 days.

Get in touch

Typical response within two business days for qualified project inquiries.